Choosing the right insulation starts with understanding R-value. Here is what you need to plan insulation work in Quebec, straight to the point.

01/

R-12

R-20

R-24

02/

Above-grade walls R-24.5 effective Effective value of the full wall assembly, thermal bridging included, not just the cavity insulation.
Roof and attic R-41 to R-60 The attic is often the most cost-effective place to add insulation.
Foundation walls R-17 effective Plan for moisture management before insulating a foundation wall.

These values are provided for information only and do not constitute professional advice. Refer to the Quebec Construction Code in force and validate your assemblies with a building professional or your municipality before starting work.

03/

Start with the assembly you are insulating: walls, attics and foundations have different targets. Then check the space available in the cavity: compressed insulation loses performance. Account for the complete assembly, including the thermal bridging created by the framing. Finally, adjust for the project: new construction, additions and renovations do not always face the same requirements. When in doubt about a code requirement, consult a professional: our job is to get you the right product, at the right price, at the right time.

04/

  • Proven performance

    A batt insulation used on North American jobsites for decades, with R-values that hold over time when installed correctly.

  • Fast installation

    Batts sized for standard framing, easy to cut and fit. Your crews move fast, no specialized equipment required.

  • Non-combustible material

    Fiberglass is naturally non-combustible. Check each product's data sheet for exact ratings.

  • Recycled content

    Owens Corning fiberglass insulation contains a significant share of recycled glass. See the data sheets for certified percentages.

05/

A batt delivers its rated R-value only when it fills the cavity without compression, without voids and without being forced around obstacles like electrical boxes and plumbing. The vapour barrier must be continuous on the warm side, in line with recognized practice and the Code. These principles are general reminders: always follow Owens Corning's installation instructions and the requirements that apply to your project.

Need help with your quantity takeoff?

Send us your plans or square footage. We will come back with the right products in the right quantities.

Contact us